|
Home
>Technology Center >
Engineering
Committees > P-4 Committee
Minutes
of P-4 Committee on Mechanical Outlines of Passive Components
October 8, 2002
Marriott City Center, Charlotte, NC
|
Members
Present
|
|
Name
|
Organization
|
|
|
| Daniel
Giblin |
Cooper
Bussman |
|
|
| Laird
Macomber |
Cornell
Dubilier |
|
|
| Ed
Mikoski |
EIA/ECA |
|
|
| Mike
Lauri |
IBM |
|
|
| Brian
Piscitelli |
KOA
Speer Electronics, Inc. |
|
|
| Terry
Charles |
Panasonic |
|
|
| Patrick
Kyne |
DSCC |
|
|
| Michael
Mosier |
Vishay/Mallory |
|
|
| Ted
Coler |
Vishay |
|
|
| Mark
Cohen |
Maxwell
Technologies |
|
|
| Ming
Li |
AEM |
|
|
| Len
Metzger |
Panasonic |
|
|
|
Member
Organizations Present
|
Present
at this meeting?
|
Present
at Previous Meeting?
|
Meeting
prior previous?
|
| Cooper
Bussman |
Yes
|
Yes
|
Yes
|
| Panasonic
Industrial Co. |
Yes
|
Yes
|
Yes
|
| KOA
Speer Electronics |
Yes
|
Yes
|
Yes
|
| Vishay/Mallory |
Yes
|
No
|
No
|
| Cornell-Dubilier |
Yes
|
Yes
|
No
|
| IBM
Corporation |
Yes
|
Yes
|
No
|
| Vishay |
Yes
|
No
|
No
|
| AEM |
Yes
|
No
|
No
|
|
Member
Organizations Absent
|
Present
at this meeting?
|
Present
at Previous Meeting?
|
Meeting
prior previous?
|
| SAN-O
Industrial Corp. |
No
|
Yes
|
Yes
|
| Littelfuse,
Inc. |
No
|
No
|
Yes
|
| Lucent
Technologies |
No
|
No
|
Yes
|
| KEMET
Corp. |
No
|
Yes
|
No
|
| SEI
Electronics |
No
|
Yes
|
No
|
| Taiyo
Yuden |
No
|
No
|
Yes
|
|
Other
Organizations Present
|
| DSCC |
|
|
|
| EIA/ECA |
|
|
|
| Maxwell
Technologies |
|
|
|
1.0
Introductions
The meeting was called to order at 10:35 a.m. A round of self-introductions
was conducted.
2.0 Committee
Organization and Procedures
2.1 Membership and Attendance
The membership list was reviewed and adjusted to read as reflected in
the following table. A quorum was present.
2.2 Approval of
Agenda
The Committee unanimously accepted the Agenda as with the deletion of
Nick Marshall under 3.2.
2.3 Approval of
April 2001 San Antonio, TX Meeting Minutes
The minutes of the April 2002 San Antonio, TX meeting were approved.
2.4 Correspondence
The chairman received one correspondence from Mike Griffith of the P-10
committee. Mike sent P-10's outlines in .PDF format to be updated into
the newly formatted PDP-100.
Ed Mikoski from
EIA/ECA did have some correspondence from Carl Lindquist who could not
attend the meeting. The correspondence is summarized in the attached
handout titled "ECA Mechanical Outlines".
2.5 Review of the
Committee's Scope
The wording of the committee scope was unchanged.
2.6 Working Group
Reports
No working group reports were presented.
3.0 Old Business
3.1 Reformatting
of PDP-100 (Electronically for the Web) - Carl Lindquist
Below is a little background from the previous minutes which outlines
the work which Carl performed to bring PDP-100 into an electronic format.
Background
"Carl Lindquist presented his work on a proposed database for components
that would eventually replace the PDP-100 document and be more useful
for the industry. He demonstrated the database that he had his engineering
people prepared and demonstrated some fuse documents from his company.
The group approved the concept. The next step is to get the ECA database
contact together with the San-O Industrial Corp database expert to convey
the basic concept of the database.
The database search
engine can be seen at www.sanodevelopment.com/search-new1.asp or www.sanodevelopmant.com/initial-search.asp
. The database allows parts to be selected by the following: Mounting,
Type, Termination, Format, Length, Width, and Height. The discussion
came up to add electrical parameters to the database. A standard electrical
parameter format must first be established."
New Information
from the Fall/Charlotte Meeting
Due to some issues at San-O Industrial the electronic database of PDP-100
is no longer on the San-O website. Carl is saving the database and programming
on a CD which will be sent to Ed at EIA/ECA for Ed to find a new home
for the database. This will now be maintained by EIA/ECA.
Attached is correspondence
from Carl Lindquist (reference section 2.4 above). This report outlines
the newly developed/proposed part numbering system for PDP-100. The
task group of Carl Lindquist, Terry Charles, Dan Giblin, and Brian Piscitelli
will review the correspondence and hold a conference call sometime during
the first week of November to decide if this proposed part numbering
system is the way to go.
3.2 Other
No other topics were discussed.
4.0 New Business
4.1 Review of PDP-100
The group has decided to review all outlines in PDP-100 and over the
next several meetings. One hour of the meetings will be set aside for
the group to one by one review the outlines and determine if they should
be converted to the newly developed electronic format and proposed updated
part numbers. If there are any questions the committee will defer to
the responsible P-panel.
4.2 Review of Open Projects
There were currently two documents at the SP Level (SP-2567 and SP-2960),
the committee unanimously voted to delete the two open projects.
4.3 Selection of
New Chairman and Vice-Chairman
The committee unanimously voted Carl Lindquist to the New Chairman and
Ted Coler to Vice-Chairman.
5.0 Next Meeting
The next meeting will be at the 6th ECA Spring Engineering Summit
the week of 14 April 2003 at Tempe, Arizona.
6.0 Adjournment
The meeting was adjourned at 11:45 a.m.
This meeting was
conducted in accordance with the EIA Legal Guidelines and the Manual
of Organization and Procedures.
Brian Piscitelli, Chairperson
Signature on file
Edward F. Mikoski,
Jr., Acting Secretary
Signature on file
Return
to P-4 menu
|