Minutes
of the CE-2.0 National Connectors Standards Committee
November 6-7, 2002
Saint Augustine Beach, FL
|
Name
|
Organization
|
|
Members
Present
|
| Carl
Fritz |
FCI
Electronics |
| H.
John Healy, Ph.D |
IBM |
| Frank
Ruffino |
Molex
Inc. |
| David
Bouzek |
Tri-Star
Electronics |
| Bill
Upstone (Vice Chairman) |
ITT
Cannon |
| Rick
Taylor |
DSCC |
|
Members
Absent
|
| Max
Peel |
Contech
Research |
| Vincent
Pascucci |
Tyco
Electronics/AMP |
| Tim
Kepley |
Positronic
Industries, Inc. |
| Bill
Peverill (Secretary) |
WPA |
| Jeff
Toran |
FCI
|
| Al
Davis |
Amphenol |
|
Others
Present
|
| Ed
Mikoski |
EIA/ECA
Staff |
| Harvey
Waltersdorf (Chairman) |
|
| W.
William Podszus, Ph.D |
QA
Technology Company, Inc. |
Meeting
number 31 of the National Connectors Standards Committee convened at 8:00
AM on November 6, 2002.
Harvey Waltersdorf,
Chairman of CE-2.0, welcomed all the attendees.
1. REVIEW AND APPROVAL
OF MINUTES
The minutes of Meeting
No. 30 held in Albuquerque, NM, in April 2002, were approved as published.
2. CHAIRMAN'S REPORT
AND ANNOUNCEMENTS
A. There was considerable
discussion on meeting attendance and what constitutes a quorum. For the
purpose of this meeting and in compliance with EIA EP-20 five members
will constitute a quorum.
3. SUBCOMMITTEE
MEETINGS
CE-2.2 Circular Connector
Specifications-Chairman: Al Davis
No report.
CE-2.3 Rectangular Connector Specifications-Chairman: Open
A. EIA-616 (SP-4644-A)
Carl Fritz reported that 2 approved ballots with editorial comments were
received by Jeff Toran from Harvey Waltersdorf and Nathan Pascarella.
The editorial comments were reviewed and discussed at the EIA CE-2.0 in
November 2002. The committee accepted the majority of the editorial comments
and rejected the addition of a flow chart and other editorial changes
in the test sequence area submitted by Nathan Pasarella, since the current
format is in compliance to EIA and IEC standards. It was unanimously moved
and approved that the specification be sent to EIA for ETC ballot.
B. HSSDB9 Connector
The sponsor Frank Ruffino requested that the project be removed from the
agenda.
C. SCA2 Variation
Frank Ruffino will investigate what changes were being requested.
D. ARINC Report
There was no report given. Harvey will check with Georgio Caioli for an
up date.
E. Detail Specification
for the D-subminiature.
The project was removed from the agenda due to lack of activity. It is
believed that this project was introduced as an ARINC project by Georgio
Caioli.
CE-2.4 Printed Board
Connector Specifications-Chairman: Rick Taylor
Note: Rick Taylor
has asked to be removed as Chairman of this sub-committee due to a conflict
of interest.
A. STG-22-2.4, (PN-3702
and 3703): High Density Blade and Tuning Fork Connectors
Carl Fritz provided a summary of this document activity. He indicated
that these 2 specifications were approved for ETC ballot. The remaining
issue is locating the original artwork. Since Cliff Hogan is no longer
with Abel Conn, Carl Fritz provided the contact names of Jim Nyland (supervisor)
or Leanne Thorburn (secretary) at (763) 536-3603 at Abel Conn for followup.
B. IS-753
It was unanimously moved and approved to reaffirm IS-753 for an additional
5-year period. It was reported that this standard is being used in industry
and will be retained until such time as a revision is processed. The motion
was made by Rick Taylor and seconded by Bill Upstone.
CE-2.5 Backplane Specifications-Chairman:
Al Davis
Committee is still
inactive, but will remain on the agenda.
CE-2.6 Contact Specifications-Chairman:
Dave Bouzek, Vice Chairman:Rick Taylor
Dave handed out a copy of the presentation that he made at the SAE meeting
on high strength nickel-plated wire test plan (see attachment XX).
Dave will determine
the status of Max Peel's Compliant Pin Guidance Document.
CE-2.7 Editing Subcommittee-Chairman:
Open
In the absence of
a chairman, Carl Fritz facilitated the meeting. Carl reported that he
was still working on the guidance document for preparing TP's and has
formatted several TP's for members. His report was unanimously moved and
approved.
CE-2.8 International
Standards Subcommittee: Chairman: Jeff Toran
Carl Fritz reported
that the last IEC 48B meeting was held in Holland in October 2002. He
indicated that a copy of the meeting summary will be provided by Jeff
Toran as soon as it is prepared. (see attachment XX) IEC 48B is scheduled
to meet at EIA Headquarters in May 2003.
4. WORKING GROUP
MEETINGS
CE-2.0.1 Contact and
Connector Plating-Chairman: Bill Upstone
A. Bill indicated
that he is still monitoring any activity related to ASTM-B700 (cadmium),
and AIR 4789 related to corrosion that is being revised by SAE and should
be available after the first of the year.
B. Bill discussed
the on going activities on whisker free tin plate, as well as the issue
of lead free solder.
CE-2.0.3 Insulator
Materials-Chairman: Frank Ruffino
No activity since
last meeting.
CE-2.0.4 Connector
Outlines & Surface Mount Activites (Chairman: TBD)
Ed Mikoski reported
that P-4 is spear heading the reactivation of PDP-100. The intent is to
go to an electronic database through the ECA web site instead of the current
paper copy, together with hot links to manufacturers products.
5. SPECIAL TASK
GROUP MEETINGS
STG-13-2.0 Terminology-Chairman:
Rick Taylor
Rick Taylor reported
that he has request and received a project number to revise EIA 622 (PN-5037)
from EIA. The committee unanimously moved by Rick Taylor, seconded by
David Bouzek, and approved that the document be sent out on a 90-day letter
ballot.
STG-20-2.0 Space Requirements-Chairman:
Charles Gamble Jr.
No Report. TP-89 still needs to be updated.
STG-23-2.0 Current
vs Temperature Rise-Chairman: Max Peel
No report.
CE-2.1 Test Procedures Subcommittee-Chairman:Bill Peverill, Vice Chairman:
Max Peel
Subcommittee on The Test Procedures was convened by Carl Fritz in the
absence of Bill Peverill (see attachment XX) for meeting report. At the
conclusion of the meeting the actions of the subcommittee were unanimously
approved.
The meeting adjourned
at 4:00 PM on November 6, 2002, and reconvened at 8:00 AM on November
7, 2002.
6.0 LIASION REPORTS
A. DSCC (Including
Army, Air Force, & Navy (except NAVAIR)
Rick Taylor reported on DSCC activities (see attachment XX for his report).
B. NAVAIR LAKEHURST REPORT
Harvey Waltersdorf read a report from Dwight Tabit on status of the harmonization
effort (see Attachment No. XX for his report).
C. SAE/ISO
Dave Bouzek provide a copy of the agenda form the SAE meeting held 23-25
October 2002 as shown in Attachment XX. Dave gave a report of the ISO
TC-20 meeting that took place on October 10, 2002. Of specific note was
the request of the ISO TC-20 / SC 1 committee to have the EIA CE-2.0 committee
participate in a harmonization effort between the EIA-364 standard test
procedures and those currently contained in ISO 2100/EN 2591. It was reported
that Mr. Tim Guilliams (Boeing) is the member of the WG-10 task group
and Bill Upstone will contact him for further activity clarification.
D. ASTM
Frank Ruffino reported that there is a meeting the week of 4 November
2002.
E. CE-3.0
Harvey Waltersdorf reported that there has not been a meeting since the
last meeting of EIA CE-2.0 committee.
F. NASA
No report
G. IICIT
No report.
7.0 OLD OLD BUSINESS
A. EIA-700AOAE
It was noted that there are changes pending on this standard by Max Peel.
However, the committee was not sure of the changes since Max was not present.
8.0 NEW BUSINESS
Harvey reported that
EIA CE-3.0 is in the process of revising EIA-5400000, the generic specification
for sockets. This document (see attachment XX) should be used as a strawman
when the EIA CE-2.0 committee generic specification EIA-7000000 for connectors
is revised as part of the 5 year review.
9.0 FUTURE MEETINGS
A. Meeting site for
April 2003 has been changed from Seattle, WA to meet in conjunction with
the April 2003 SAE meeting in either in San Diego Area or Monterey, CA
(Motion made by Rick Taylor and seconded by Dave Bouzek, and unanimously
approved by the members present)
B. Fall 2003 meeting
will be considered to meet in conjunction with the ECA Fall Summit.
The meeting adjourned
at 1:10 PM on 7 November 2002.
This meeting was conducted
in accordance with EIA Legal Guidelines and EIA Manual for Organization
and Procedure.
Wm. Peverill,
Secretary
EIA/ECA CE-2.0
Harvey Waltersdorf,
Chairman
EIA/ECA CE-2.0