Home
>Technology Center
> Engineering Committees
> P-4 Committee
Minutes
of P-4 Committee on Mechanical Outlines of Passive Components
April 15, 2003
Tempe Mission Palms - Tempe, AZ
|
Members
Present
|
|
Name
|
Organization
|
|
|
| Terry
Charles |
Panasonic |
|
|
| Mark
Cohen |
Maxwell
Technologies |
|
|
| Ted
Coler |
Vishay
Dale |
|
|
| Mike
Lauri |
IBM |
|
|
| Ming
Li |
AEM,
Inc. |
|
|
| Carl
Lindquist |
San-0
Industrial Corp. |
|
|
| Laird
Macomber |
Cornell
Dublier |
|
|
| Maher
Mahmud |
IBM |
|
|
| John
Mazzola |
Cooper
Bussmann |
|
|
| Ed
Mikoski |
EIA/ECA |
|
|
| Stephen
Olster |
Mini-Systems
Inc. |
|
|
| Brian
Piscitelli |
KOA
Speer Electronics |
|
|
|
Member
Organizations Present
|
Present
at this meeting?
|
Present
at Previous Meeting?
|
Meeting
prior previous?
|
| Cooper
Bussman |
Yes
|
Yes
|
Yes
|
| Panasonic
Industrial Co. |
Yes
|
Yes
|
Yes
|
| KOA
Speer Electronics |
Yes
|
Yes
|
Yes
|
| SAN-O
Industrial Corp. |
Yes
|
No
|
Yes
|
| Cornell-Dubilier |
Yes
|
Yes
|
Yes
|
| IBM
Corporation |
Yes
|
Yes
|
Yes
|
| Vishay |
Yes
|
Yes
|
No
|
| AEM |
Yes
|
Yes
|
No
|
|
Member
Organizations Absent
|
Present
at this meeting?
|
Present
at Previous Meeting?
|
Meeting
prior previous?
|
| *
Littelfuse, Inc. |
No
|
No
|
No
|
| *
Lucent Technologies |
No
|
No
|
No
|
| KEMET
Corp. |
No
|
No
|
Yes
|
| SEI
Electronics |
No
|
No
|
Yes
|
| *
Taiyo Yuden |
No
|
No
|
No
|
* Indicates
dropped for Quorum calculation due to history of non-attendance
|
|
Other
Organizations Present
|
| EIA/ECA |
|
|
|
| Maxwell
Technologies |
|
|
|
Scope
of the P-4 Committee on Mechanical Outlines of Passive Components -
Provide standardization, administration, and circulation of mechanical
outline drawings of electronic parts formatted per PDP-100 provided
by industry participants.
1.0 Call
to Order
The meeting was
called to order at 4:15 PM. A round of self-introductions was conducted.
2.0 Introductions and Attendance
2.1 Membership and Attendance
The membership list was reviewed and adjusted to read as reflected
in the following table. A quorum was present.
2.2 Approval of Agenda
The Committee unanimously accepted the Agenda as with the deletion
of Nick Marshall under 3.2.
2.3 Approval of October 2002 Charlotte, NC Meeting Minutes
The minutes of the Charlotte, NC meeting were approved.
3.0 General Discussion
3.1 Election of Chair and Vice Chair
It was asked if any other attendees would like to volunteer for the
Chair and Vice Chair positions. With no responses, C. Lindquist, who
was elected in absentia a the last meeting, will remain Chair. Ted
Coler will remain Vice Chair.
3.2 Develop Scope For P4
Attendees were asked if a change in Scope was required. It was agreed
that the existing Scope was appropriate and no changes will be needed
to proceed with our intended task.
3.3 Items to be added to New Business
None
4.0 Mechanical Outlines
A PowerPoint presentation was made by C. Lindquist
to demonstrate the new proposed database search by drawing number procedure.
While there were several questions, the only change agreed upon was
the use of only six digit EIA Drawing Numbers in the future. This will
clarify the component dimensions for those unfamiliar with earlier Mechanical
Outlines in PDP 100. An earlier proposal permitted alternate use of
four digit Drawing Numbers where the component cross section was square.
Requests to include more information, such as lead free status, in the
Mechanical Outlines were discouraged. These drawings should be limited
to mechanical data only. Any other information concerning specific construction,
materials and / or electrical parameters should be left to the manufacturers'
discretion on referenced (linked) Web Sites.
4.1 Proposed New Outlines For Approval
It was recommended that each component Subcommittee establish a Working
Group that will address all proposed Mechanical Outline Drawing Number
identifications for submission to, and approval by, the associated
Subcommittee. Final approved Outlines will then be submitted to the
P4 Mechanical Outline Subcommittee. The first task for Working Groups
for each type of passive component will be the development and review
of appropriate codes to be used on the associated Mechanical Outlines.
All Mechanical Outlines approved by the specific Subcommittees will
then be submitted to the P4 Subcommittee for final review of layout
and content. If found to be acceptable, the Mechanical Outline will
be forwarded to the EIA / ECA for placement on the Web Site.
4.1.1 Acceptable Drawing Layouts
Drawing layouts will continue to follow the description employed
in the earlier PDP 100 manual, with the exception of the new Drawing
Number system. New parameters will be incorporated as work progresses
with the EIA / ECA IT Group to link to Member Web Site locations
via "Variation" on each Mechanical Outline. We will also
work to link with associated published EIA / ECA Specifications
via the "Drawing Numbers". Only Members of EIA / ECA will
have access privileges beyond the Mechanical Outlines made available
at no cost to all on the EIA / ECA Web Site. The ability (and privilege)
to directly link from a component Mechanical Outline "Variation"
to a Member Web Site will be of considerable marketing value to
EIA / ECA Members.
4.1.2 Acceptable File Formats
Adobe Acrobat 5.0 or later will be the required format for Mechanical
Outlines to be placed on the EIA / ECA Web Site. Use of this format
will permit linking of the "Variation" and "Drawing
Number" to remote sites. Earlier versions of this same software
do not support this function.
4.2 Assignments Associated With Various Passive
Components
4.2.1 Working Groups
As noted earlier, each Subcommittee will create a Working Group
to oversee details associated with Mechanical Outlines covering
component packages used by the members. The numbering system will
need to be reviewed by each Subcommittee and associated Working
Group to insure the system can continue to be expanded to cover
all known products. Drawing Numbers presently used in the PDP 100
Drawings will not be compatible with the new numbering system. There
will likely be a need to provide a cross reference from the old
Mechanical Outline to a newly assigned, searchable, Drawing Number
for those components presently referenced by the old number in existing
documentation.
4.2.2 Chairs and Secretaries
Since the Mechanical Outline effort will be significant, a Chair
and Secretary should be identified for each Subcommittee Working
Group.
5.0 Mechanical Outline Web Site Development and Maintenance
Development and maintenance of the EIA / ECA Mechanical Outline Database
will be retained in the P4 Subcommittee and rely on support of the EIA
/ ECA TI personnel, as well as input from members of each component
Subcommittee.
5.1 Drawing Numbering System
The basic Drawing Number System for the following components has been
initially developed. Actual Mechanical Outlines updated with the new
numbering system are as noted.
5.1.1 Fuses-
Approximately 30 Mechanical Outlines are ready for placement on
a limited access Web Site.
5.1.2 Resistors-
Awaiting input from Subcommittee
5.1.3 Capacitors-
Awaiting input from Subcommittee(s)
5.1.4 Inductors-
Awaiting input from Subcommittee
5.2 Database Development Status
The basic database has been developed. P4 Members will continue to
work with EIA / ECA IT System personnel as the program expands and
improves.
6.0 New Business
None
7.0 Old Business
None
8.0 Announcements
None
9.0 Next Meeting -
Week of 6-9, 2003 San Antonio, TX
10.0 Adjournment
The meeting adjourned at approximately 5:45pm
This meeting was conducted in accordance with the EIA Legal Guidelines
and the Manual of Organization and Procedures.
Carl Lindquist - Chairperson
Ed Mikoski - Acting Secretary
Return