Home > Technology Center > Engineering Committees > P-1 Committee

Minutes of P-1 Committee on Resistive Devices
April 16, 2002
Sheraton Old Town Inn, Albuquerque, NM

Members Present
Joe Biernacki SEI Electronics
Ted Coler Vishay Intertechology
Michael Griffith KOA Speer Electronics
Mike Lauri IBM Corporation
Brian Piscitelli KOA Speer Electronics
Les Rice KOA Speer Electronics
Dave Ritchey Phycomp, Inc.
Members Organizations Present
Present at Previous Mtg?/Present at mtg prior to previous?
IBM Corporation No/Yes
Phycomp USA, Inc./Yageo America Yes/Yes
KOA Speer Electronics Yes/Yes
Vishay Yes/Yes
SEI Electronics Yes/No
Members Organizations Absent
Present at Previous Mtg?/Present at mtg prior to previous?
Lucent Technologies Yes/No
Panasonic Yes/Yes
Mini Systems, Inc. Yes/Yes
CTS Yes/Yes
Other Organizations Present
  EIA/ECA

1.0 Introductions
Self-introductions were made.

2.0 Committee Organization and Procedures

2.1 Membership and Attendance
Attendance was taken, and it was determined that a quorum was present. All attendees verified the correctness of the information on the rosters.

2.2 Approval of Agenda
The Committee unanimously accepted the Agenda as presented.

2.3 Approval of October, 2000 Meeting Minutes
The minutes of the Monday, October 8, 2001 Loews Hotel Philadelphia, Pennsylvania meeting were approved.

2.4 Correspondence
The only correspondence was information from Doug Corbin from Kamaya regarding the addition of the 0201 and 0402 sizes to EIA-575-A and EIA-576-A. This information was presented under section 3.3 of old business

2.5 Review of the Committee's Scope
No changes in committee scope.

2.6 DSCC Report
Dennis Cross from Defense Supply Center Columbus reviewed the list of revised documents relating to resistors. A copy of the revised documents is attached.

3.0 Old Business

3.2 Review ESD tests in EIA/IS-703 and compare to AEC-Q200 Rev B matrix. Also compare IEC-801 - Dave Ritchey
Due to restructuring with in Dave's company he was unable to complete the comparison. Dave will keep the action item and report at the October 2002 meeting.

3.3 Add 0201 implementation issues to the agenda for future considerations - Nick Marshall
No one was sure what the specifics of the subject were, and since Nick was not present at the meeting and no report was submitted to the chair, this item will be deleted from any future agenda's until Nick returns to a meeting.

3.4 Addition of 0201 and 0402 sizes to EIA-575-A and EIA-576-A - Stephen Olster and Maureen Slezak
Neither Stephen Olster or Maureen Slezak (no longer with Kamaya) attended the meeting. Chairman Brian Piscitelli did receive correspondence from Doug Corbin from Kamaya who could not attend either but did start to add the 0201 and 0402 information to the specifications.

The committee reviewed EIA-575-A in detail during and proposed the following changes/additions:
· Add 0201 and 0402 dimensions and power ratings to the specification.
· Revise the power ratings for the other sizes. Example: The specification rates a 1206 as 1/8 watt while the industry now rates the part at ¼ watt. A note should also be added to explain the increased power ratings.
· Add 1218 dimensions and power ratings to the specification.
· Review the test methods and change from EIA-186 to MIL-STD-202 latest revision.
· Add 0.5% tolerance and +/- 50 ppM/C TCR
· Increase the temperature range to 150 C, also update the derating curve.

The committee then reviewed EIA-576-A in detail and proposed the following changes/additions:
· Add the 0201 and 0402 dimensions and power ratings.
· Add 0.05% tolerance
· Review the test methods and change from EIA-186 to MIL-STD-202 latest revision.

The action item of making the above updates to both EIA-575-A and EIA-576-A will be done by Brian Piscitelli. Once completed the specifications will be emailed out to the committee for review so a formal vote can take place at the October 2002 meeting.

4.0 New Business

4.2 Review resistor outlines as they now relate to the new PDP-100 Mechanical Outline system
The P-4 committee updated the PDP-100 Mechanical Outline specification from a paper/binder format to a searchable database on the web. It was started with fuses - but each committee was asked in the U-1 meeting to review the newly updated part number system and try to redo there respective outlines. Dave Ritchy will take the action to review the resistor outlines versus the new PDP-100 specification and report to both the P-4 and P-1 committees at the October meeting. The web sites for the new searchable PDP-100 are as follows:

www.sanodevelopment.com/search-new1.asp
or
www.sanodevelopment.com/initial-search.asp

5.0 Next Meeting
The next meeting will be at the 5th ECA Engineering Summit week of 7 October 2002 in Charlotte, North Carolina. The meeting time will be 2:00 to 4:00 pm Tuesday, October 8, 2002.

6.0 Adjournment

The committee adjourned at 11:15 AM.

This meeting was conducted in accordance with the EIA legal guidelines and the Manual of Organization and Procedures.

Brian Piscitelli, Chairperson
Signature on file

Edward F. Mikoski, Jr., Acting Secretary
Signature on file

Return to P-1 Main