|
Home > Technology Center > Engineering Committees > CE-2.0 Committee Minutes
of the CE-2.0 National Connectors Standards Committee
Note: All attachmnents are Adobe Acrobat PDF files. See
Attachment No. 12 for member phone, fax & e-mail numbers &
mailing address. 1. REVIEW AND APPROVAL
OF MINUTES 2. CHAIRMAN'S REPORT A. Bill O'Hirok read a letter of resignation from Jim Koser and announced that he had appointed Carl Fritz to replace Jim Koser, as Chairman of CE-2.3 Rectangular Connector Specifications. B. Master membership list was circulated for updating and Bill O'Hirok thanked members for returning the meeting notice attendance slips. C. Bill O'Hirok noted that anybody introducing a product with intellectual property concerns must sign a licence to release. Bill read a letter from Whitaker Corp showing how this is done. D. Bill O'Hirok reported that he had attended the first ECA Engineering Summit. He noted that our documents will still be EIA documents, otherwise we are part of ECA. He said that had vetoed a proposal for joint meetings of Committees as we prefer to meet separately. However, their next meeting will be in October, 2001. E. Bill O'Hirok presented Carl Fritz the ECA Award of Excellence-Electronic Component Engineering Volunteer, for his outstanding contributions to CE-2.0. F. Carl Fritz reported
that ECA had recanted on having EIA TP's posted on the web. To restate
and reconfirm the Committee's earlier positions, Carl Fritz moved "
all EIA 364 procedures be placed on the web free of charge". The
motion was seconded by Frank Ruffino. In discussion, Rick Taylor, DSCC,
noted that the Military had been counting on the TP's being on line.
Also, Marty Freedman reported that the IPC has all of it's Test Procedures
on line. The motion carried unanimously (18 for, 0 against). CE-2.2 Circular
Connector Specifications-Chairman Al Davis CE-2.3 Rectangular
Connector Specifications-Chairman: Carl Fritz. CE-2.4 Printed Board
Connector Specifications - Chairman: Rick Taylor, Vice Chairman: Carl
Fritz CE-2.5 Backplane
Specifications - Chairman: TBD CE-2.6 Contact Specifications-Chairman:
Dave Bouzek , Vice Chairman: Rick Taylor CE-2.7 Editing Subcommittee
- Chairman: Carl Fritz CE-2.8 International
Standards Subcommittee - Chairman: Jeff Toran 4.0 WORKING GROUP MEETINGS CE-2.0.1 Contact
and Connector Plating - Chairman: Peter Willcox CE-2.0.4 Connector
Outlines & Surface Mount Activities - Chairman: TBD 5. SPECIAL TASK GROUP MEETINGS STG-13-2.0 Terminology
- Chairman: Rick Taylor STG-20-2.0 Space
Requirements - Chairman: Charles Gamble,Jr STG-23-2.0 Current
vs Temperature Rise - Chairman: Max Peel The meeting adjourned at 5:10 pm and reconvened on November 1, 2000 at 8:30 am. CE-2.1 Test Procedures
(Chairman: Bill Peverill, Vice Chairman Max Peel) The meeting adjourned at 4:40 pm and reconvened at 8:30 am on November 2, 2000. 6.0 LIAISON REPORTS A. DSCC (Including
Army, Air Force & Navy [except NAVAIR]) B. NAVAIR LAKEHURST
REPORT C. SAE Report E. ISO Report F. ASTM G. CE-3.0 H. NASA I. IICIT 7.0 New Business A. Harvey Waltersdorf
reported that he had received a request from Jay Neer to start a project
on a B. Several of the members expressed their opinion that selecting a meeting site two years out was not workable. Following these desires, the October 2002 site was not selected. However, the present list of sites will not change. It was agreed that the meeting site means the general area of the site. The possibility of holding future CE 2.0 and 3.0 meetings together at the Engineering Summit next year was also discussed. The chairman agreed to consider moving the selection of sites to the front of the agenda.
A. February, 27,28
& March 1, 2000 San Diego, CA B. June, 5,6 & 7, 2001 Calgary Canada C. October, 2001 Cape Cod, MA D. February, 2002 Henderson, NV E. June, 2002 Ann
Arbor, MI This meeting was conducted in accordance with EIA Legal Guidelines and EIA Manual for Organization and Procedure. William Peverill,
Secretary W.D. O'Hirok, Chairman 1,
2,
3,
4,
5,
6,
7,
8,
9,
10,
11,
12
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |