|
Home
> Technology Center
> Engineering Committees
> CE-2.0 Committee
CE-2.0
Committee on National Connector Standards
AGENDA
MEETING NUMBER
29
CE-2.0 COMMITTEE ON CONNECTOR STANDARDS
Marriott Hotel
110-9 Avenue S.E.
Calgary, Alberta Canada T2G 5A6
403-266-7331
The CE-2.0 Committee on Connector Standards and its Subcommittees, Working
Groups, and Special Task Groups will meet on June 5,6,& 7, 2001.
The meeting will start at 8:30 AM on Tuesday, June 5 and conclude at
4:30 PM on Thursday, June 7 , 2001. Note: The meeting will run sequentially,
with no specific time scheduled for the individual agenda items shown
below. The Chairman may vary the sequence as needed. Members are requested
to plan on attending the meeting for a full three days (early departures
effect the completion of agenda work).
CE-2.0 AGENDA
1. Review and approval of previous meeting minutes.
2. Chairman's Report and Announcements (Bill O'Hirok)
A. SUBCOMMITTEE
MEETINGS
CE-2.2 Circular
Connector Specifications (Chairman: Al Davis)
CE-2.3 Rectangular
Connector Spec.(Chairman: Carl Fritz)
CE-2.4 Printed Board Connector Spec.(Chairman: Rick Taylor, Vice Chairman:
Carl Fritz)
STG-22-2.4 High Density Blade & Tuning Fork (Chairman: TBD)
PN4090 (Frank Ruffino/ Mary Freedman)
CE-2.5 Backplane
Specifications
(Note: This subcommittee is currently inactive)
CE-2.6 Contact
Specifications (Chairman: Dave Bouzek, Vice Chairman: Rick Taylo
PN on Compliant Pin Guidance Document (Chairman: Max Peel)
CE-2.7 Editing
Subcommittee (Chairman: Carl Fritz)
CE-2.8 International
Standards Subcommittee (Chairman: Jeff Toran)
W.G.-2.8.1 IEC Technical Advisory Group-TC 48 (Chairman: Jeff Toran)
B. WORKING
GROUP (CE-2.0) MEETINGS
CE-2.0.1 Contact and Connector Plating (Chairman: Peter Willcox)
CE-2.0.3 Insulator
Materials (Chairman: Frank Ruffino)
C. SPECIAL TASK GROUPS (CE-2.0) MEETINGS
STG-13-2.0 Terminology (Chairman: Rick Taylor)
STG-20-2.0 Space
Requirements (Chairman: Charles Gamble Jr. )
STG-23-2.0 Current
vs. Temp. Rise (Chairman: Max Peel)
3. CE-2.1 SUBCOMMITTE
ON TEST PROCEDURES(Chairman Bill Peverill, Vice Chairman-Max Peel)
STG-15-2.1 on Low Frequency Shielding(Chairman Al Davis)
STG-33-2.1 on Electronic Signal Methods(Chairman: Jeff Toran)
STG-29-2.1 on Performance Criteria (Co-Chairmen: John Healy & Max
Peel)
4. LIAISON REPORTS
A. DSCC (Including
Army, USAF, Navy [except NAVAIR])-Rick Taylor
B. NAVAIR-Dwight
Tabit
C. SAE-Dave Bouzek
D. ISO-Dave Bouzek
E. ASTM-Frank Ruffino
F. EIA CE-3.0-Harvey
Waltersdorf
G. NASA-Charles
Gamble Jr.
H. IICIT-Marty
Freedman
5. New Business
6. Next Meeting
October, 2001 Cape Cod, MA
Bill O'Hirok-Chairman
Harvey Waltersdorf-- Vice Chairman
Bill Peverill-Secretary (wmpev@aol.com)
PROPOSED MEETING
AGENDA-CE-2.1 SUBCOMMITTEE ON TEST PROCEDURES.
June 5-7, 2001-Calgary, Canada
1. Approval of
the February, 2000 minutes
2. TEST PROCEDURE
PROJECTS (BY PROJECT NUMBER)
SP-2426, TP-80,
Low Frequency Shielding, (Al Davis/Jeff Toran)
SP-3801-A, TP-96, Plating Hole Integrity, (Jeff Toran)
SP-3988-A, TP-30A, Capacitance, (Jeff Toran/Carl Fritz)**
SP-4555-2, EIA 364D Basic Document, (Carl Fritz)*
SP-4829, TP-33A, Inductance 100nH-100mH, (Jeff Toran)
PN-4830, TP-69A, Inductance 10nH-100nH, (Jeff Toran)**
PN-4831, TP-109, Inductance 1nH-10nH, (Jeff Toran)
PN-4874, TP-04A, Normal Force, (Vince Pascucci)**
SP-4893, TP-16A, Stripping Force, (Carl Fritz)**
SP-4896, TP-62A, Terminal Strength, (Carl Fritz)**
SP-4897, TP-68A, Actuating Mechanism, (Carl Fritz)**
SP-4898-A, TP-78A, Cavity to Cavity Leakage (Carl Fritz)**
SP-4902, TP-52A, Solderability of Contact Termination
SP-4903,TP-56A, Resistance to Soldering Heat**
SP-4918, TP-58, Temp Life With Mechanical Loading
SP-4919-4, TP-51A, Ice Resistance
PN-4942, TP-60, General Methods for Porosity Testing
* Part of 1344/364
Harmonization Project. ** Hot-Past due for 5 year review
3. TEST PROCEDURES
AWAITING PROJECT NUMBERS (BY TP NUMBER)
TP-12, Restricted
Entry, (Rick Taylor)**
TP-15, Contact Strength, (Al Davis)**
TP-18, Visual Inspection, (Frank Ruffino)**
TP-29, Contact Retention, Vince Pascucci)
TP-31, Humidity, (Max Peel)
TP-32C, Thermal Shock, (Max Peel)
TP-41C, Cable Flexing, (Max Peel)
TP-48A, Metallic Coating Thickness, (Carl Fritz & Peter Willcox)
TP-55, Current Cycling, (Max Peel)**
TP-59, Low Temperature, (Frank Ruffino)**
TP-65A, Mixed Flowing Gas, (Max Peel/Vince Pascucci)
TP-75, Lightning Strike, (Al Davis)
TP-81, Combustability of Connector Housings, (Max Peel)
TP-82, Corrosivity of Plastics(Max Peel)**
TP-89, Space Applications, (Charles Gamble Jr. & Rick Taylor)
TP-XX, Dry Thermal Cycling, (Max Peel)
** Hot-Past due
for 5 year review
4. STG Reports
STG-15-2.1 Low Frequency Shielding Effectiveness-Al Davis/Jeff Toran
STG-29-2.1 Performance Criteria(EIA-364-1000.01)-John Healy and Max
Peel
STG-32-2.1 Electronic (Signal) Test Methods-Jeff Toran
5. New Business
CE-2.1 Committee
Members
Bill Peverill -
Chairman
Max Peel - Vice Chairman
Jeff Toran - Secretary
Bill O'Hirok
Frank Ruffino
Peter Willcox
Carl Fritz
Dwight Tabit
Tim Kepley
Al Davis
Dave Bouzek
Rick Taylor
Ed Sproles
Vince Pascucci
Greg Brown
Geoff Booth
Treve Smith
Steve Hanak
Trenor Williams
CE-2.3 Subcommittee For Rectangular & Trapezoidal Connectors
June 2001
Calgary, Canada
Proposed Agenda
1. Approval of
the minutes of the 27 February 2001 meeting in San Diego, CA
2. Active projects
A. EIA-616, (PN-4644): Future Bus Connector (Chairman: Carl Fritz)
B. HSSDB9 Connector
(SFF Committee document number 8480 (Sponsor: Frank Ruffino)
C. SCA2 Connector
Variation (SSF Committee document number 8073) (Sponsor: Frank Ruffino)
D. ARINC Report
(Giorgio Caioli)
New Details Specifications
for the D-subminiature
Feedback from ARINC
on the Guidelines on Working Relationship between AEEC (Airlines
Electronic Engineering Committee) and EIA
3. New business
4. CE-2.0 committee
approval of the actions taken by the subcommittee
5. Adjournment.
EIA CE-2.7 Subcommittee
on Editing
June 2001
Calgary, Canada
Proposed Agenda
1. Approval of
the minutes - 27 February 2001 meeting in Orlando, FL.
2. Give an update
on the progress of the editing committee activities.
3. General discussion.
4. New Business.
5. CE-2.0 committee
approval of the actions taken by the subcommittee
6. Adjournment.
Subcommittee CE-2.6
Contact Specification
Agenda
Approve minutes
from prior meeting.
General Discussion
· Review
PN on Compliant Pin Effort.
· Review and Discuss SAE Project: High Strength Nickel Plated
Wire.
New Business.
Adjournment.
Chairman: David
Bouzek
Phone: (310) 536-9370 Ext. 3599
Fax: (310) 536-9322
david.bouzek@tri-starelectronics.com
Vice Chairman: Rick
Taylor
CE-2.2 Circular
Connector Committee- AGENDA
June, 2001, Calgary, Canada
1. Approval of
minutes
2. Detail Specification
for insert arrangements for the Reverse Bayonet Connector
3. Detail Spec
for the Reverse Bayonet Connector
4. Part number
structure for the reverse Bayonet Connector
5. Detail specification
got a Quick Disconnect Space Application Connector
6. Enhanced MIL-DTL-38999
Plug Connector for Aircraft Engine Market
7. New Business
Top
|